The 5 Most Common Mistakes in an EAM Implementation

A well-chosen EAM system can still disappoint. It happens when the project starts from the wrong premises, not when the software is inadequate. Over years of Attune EAM (formerly HxGN EAM) projects, we have seen the same mistakes repeat across companies of different sizes and sectors. They are predictable, and therefore avoidable.

Here are the five most frequent ones: how they show up, and what to do instead.

1. Treating it as an IT project instead of a process change

The most common mistake is handing the EAM over to IT as if it were an installation: configure the system, load some data, run a training course. The software works, but nobody has redefined how people work: who raises a request, who approves it, how a work order is planned, when and by whom it is closed.

The result is a system that is technically correct and operationally useless. Maintenance teams keep using the old channels, and the EAM becomes an archive to be filled in after the fact.

What to do instead. Start from the process, not the configuration. Design the maintenance flows you want first, then configure the system to support them. The project lead should come from maintenance, with IT as the technical partner.

2. Migrating dirty data

Asset registers, hierarchies, maintenance plans and spare-part codes are often loaded “as they are”, because cleaning them up feels like lost time. Duplicates, inconsistent descriptions, decommissioned assets still marked active and hierarchies that do not reflect the actual plant all move into the new system along with everything else.

After go-live, users cannot find their machines, reports do not add up, and trust in the system collapses within weeks. From there, the way back to Excel is short.

What to do instead. Treat data cleansing as a full project activity, with an owner, shared coding rules and a check before loading. Less data you can rely on beats the entire history at uncertain quality: the rest can be added later.

3. Trying to do everything at once

Preventive maintenance, spare parts, purchasing, mobile app, KPIs: initial enthusiasm puts everything in scope and switches it all on together, across all sites, on the same day. It is an effective way to overload the project team and the users at the same moment, and to discover problems when they are already everywhere.

What to do instead. Go live in phases. Start with a limited scope, one site or one area, covering the essential processes: requests, work orders, asset register. Learn from what actually happens, and only then extend. Each phase closed well builds credibility for the next; a general launch that goes badly removes it from all of them.

4. Bending the software to the way things have always been done

“We have always done it this way” is not a requirement. Yet many projects begin with a list of habits to replicate in the new system: paper forms reproduced field by field, steps that exist only because a signature was once needed, exceptions that became the rule. Every habit turns into a customization.

The result is a heavy system, expensive to maintain and hard to upgrade, that merely photographs processes that needed rethinking. A mature EAM embeds years of maintenance good practice: ignoring it to protect habits means paying for something you do not use.

What to do instead. Use the implementation as an opportunity to question your processes. Start from what the system offers out of the box, then customize only where there is a real operational reason, not just a habit. Every customization has a cost that returns with each upgrade: it pays to know in advance whether it is worth it.

5. Involving only maintenance, and only at the end

An EAM looks like a maintenance topic, and the project often stays there. But a work order touches production, which must stop the plant or make it available; environment, health and safety, which define permits, authorizations and mandatory checks; and procurement, which manages spare parts and suppliers. If these functions discover the system when the project is nearly done, forgotten requirements and resistance emerge at a point where they cost far more to address.

The same goes for maintenance technicians: if they are involved only in the final training, they receive a system designed without them and use it accordingly, or do not use it at all.

What to do instead. Involve every function that interacts with the maintenance process from the start, together with the people who work in the field, not only managers. Even a short but steady presence during the design phase avoids surprises at go-live. How to build the project team and choose sponsors is the subject of a coming article.

It can be avoided

These mistakes share a root cause: treating the EAM as a product to install instead of a change to lead. Those who have seen them happen before can spot them in time, which is one of the reasons the experience of the people supporting the project weighs more than it seems.

In the next articles we go into the details: how to prepare your organization before starting, and what happens after go-live.

If you are evaluating an EAM project, or have one in progress that is not taking off, get in touch: a first conversation costs little and often clarifies a lot.